Please use this identifier to cite or link to this item: http://idr.nitk.ac.in/jspui/handle/123456789/13051
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKumar, Reddy, S.
dc.contributor.authorSastry, V.R.
dc.date.accessioned2020-03-31T08:45:12Z-
dc.date.available2020-03-31T08:45:12Z-
dc.date.issued2016
dc.identifier.citationJournal of The Institution of Engineers (India): Series D, 2016, Vol.97, 2, pp.205-213en_US
dc.identifier.urihttp://idr.nitk.ac.in/jspui/handle/123456789/13051-
dc.description.abstractSemi-mechanised blasting gallery mining is a sustainable option to achieve higher production and productivity from underground thick coal seams. Judicious design of underground blasting gallery panel requires understanding of stress distribution on barrier pillars during different stages of extraction. This paper presents a study of stress distribution in and around barrier pillar for the different stages of extraction in the blasting gallery panel. Finite difference analysis taken up for final excavation (depillaring) in the panel with different stages of extraction. Analysis revealed that the stress transferred on barrier pillar increased as progress of excavation increased. Maximum stress was observed at a distance of 10 and 12 m from the pillar edge for virgin and goaved out panel sideby respectively, which gradually decreased towards centre of the pillar. 2015, The Institution of Engineers (India).en_US
dc.titleStress Distribution on Blasting Gallery Barrier Pillar due to Goaf Formation During Extractionen_US
dc.typeArticleen_US
Appears in Collections:1. Journal Articles

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.