Please use this identifier to cite or link to this item: http://idr.nitk.ac.in/jspui/handle/123456789/13835
Title: Performance of deep excavation for an underground metro station constructed by top-down method—A case study
Authors: Muhammad Ramees Ali T.M.
Rajasekaran C.
Issue Date: 2019
Citation: Lecture Notes in Civil Engineering, 2019, Vol.25, pp.611-618
Abstract: The subway system plays a vital role in reducing the traffic congestion problems in urban cities. Recently, a number of underground railway transportation networks are commissioned and opened for operation or are being constructed in many cities in India. Metro station excavations is a tough task and pose threat to public safety, due to high intricacy and uncertainty in excavation activities. The stability of deep excavation and adjacent buildings has gained highlighted concerns during metro station construction. The underground metro station under study is located in Anna Salai Road, Chennai, India. The station is located at the centre of the main street. The project comprised of three basement levels. It has a length of 240 m and a width of 19–22 m at the track level. The excavation depth is about 18.0 m. The entire site is located within a floodplain. The performance of the deep excavation and adjacent area were monitored using extensive instruments. Monitored data are analyzed and presented as a case study in this paper. © Springer Nature Singapore Pte Ltd. 2019.
URI: 10.1007/978-981-13-3317-0_54
http://idr.nitk.ac.in/jspui/handle/123456789/13835
Appears in Collections:3. Book Chapters

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.